Key Points
- Fellowship Hall Restrooms Offline, 9:00 on 8/13 to 8/16
- Gym Entrance Modification, 8/14
- Stair 10, 8/16 – Stair Tread Replacement of Stairwell 10
- Replacement of Main Hall Wood Flooring, 8/26-8/31; 9/3-9/7
Fellowship Hall Restrooms – Closed 8/13 at 9:00 am to 8/16
Closed 8/13 at 9:00 am to 8/16
-
- The restrooms outside of Fellowship Hall will be closed following IRONMEN on Tuesday, August 13th through the end of the week.
- The plumbing pipes of those restrooms tie into the plumbing pipes on the 1st floor of Family Commons that requires attention.
Gym Entrance Modification
Begins August 14th (Estimated duration 3 weeks)
-
- At the entrance to the gym, the construction fencing will be pushed out beyond the current Handicap access Ramp.
- During construction, a new ramp will in the Handicap Space to reach the sidewalk.
- During construction, a new ramp will be placed over the knee wall to allow access to the patio outside the Gym main doors.
- An additional parking space will be designated for Handicap during this period.
Stairwell 10 Tread Update
Friday, August 16th
-
- The mismatched stair treads will be replaced on Friday, August 16th between the 1st and 2nd floors of Stairwell 10.
- Please utilize the elevators or Stairwell 12 from the 1st floor to gain access to other floors.
WOOD FLOORING REPLACEMENT OUTSIDE OF FELLOWSHIP HALL
IMPORTANT: Areas will be open on Sundays.
August 26-31
-
- The main hallway will be closed between the St. Andrews Room and the Flower Room to replace the Wood Floor installed during the Fellowship Hall package.
- The hallway between the St. Andrews Room and Fellowship Hall will be also be closed.
- Access to the larger Fellowship Hall Bathrooms and the Flower Room may be gained through the main Fellowship Hall Doors in the North Section.
- The Williams Center Entrance will be closed during this period.
September 3-7
-
- The Willaims Center Entrance to the main hallway will be closed to replace the wood flooring on the opposite side of the main hallway to the Williams Center Doors.
Key Dates
September 2023
Fellowship Hall Re-Opens
May 2024
Staff Offices & New Belong Spaces Open
November 17, 2024
Sanctuary & Wilson Chapel Grand Re-Opening
January 24, 2025
CFM & Lodge Grand Re-Opening
Steeple Coffee Opens