by Heather Ellison | Dec 13, 2023 | Capital Campaign Updates
Additional Temporary Walls Additional temporary walls being erected on campus. Stairwell 12 (next to the print shop) 1) The stair will be closed above the 2nd floor landing. 2) The door to the 3rd floor will be closed. 3rd Floor Gym Building A temporary wall has been...