Traffic Flow Behind the Church Thursday

The asphalt will be repaired this Thursday behind the church at the portico.  During this repair, traffic will not be able to go South behind the Portico. (You will not be able to drive from the Nursery to the Gym.)  Traffic going North behind the church will continue to flow under the portico.  (You will be able to drive from the Gym building to the nursery building.) Once the asphalt is repaired, we will be able to drive in both directions.  

      Sanctuary & Wilson Chapel Work Week of December 16th

      As the contractors are finishing up punch list items, there will be several different trades doing work in the sanctuary and Wilson Chapel.  In Wilson, they will be installing the wood trim around the Stained Glass Window.

      In the sanctuary, they will be raising the balcony railing, adjusting door swings, and installing covers on the speakers.

          Key Dates

          September 2023

          Fellowship Hall Re-Opens

          May 2024

          Staff Offices & New Belong Spaces Open

          November 17, 2024

          Sanctuary & Wilson Chapel Grand Re-Opening

          January 24, 2025

          CFM & Lodge Grand Re-Opening
          Steeple Coffee Opens

           

          Traffic Flow Behind the Church Thursday

          The asphalt will be repaired this Thursday behind the church at the portico.  During this repair, traffic will not be able to go South behind the Portico. (You will not be able to drive from the Nursery to the Gym.)  Traffic going North behind the church will continue to flow under the portico.  (You will be able to drive from the Gym building to the nursery building.) Once the asphalt is repaired, we will be able to drive in both directions.  

              Key Dates

              September 2023

              Fellowship Hall Re-Opens

              May 2024

              Staff Offices & New Belong Spaces Open

              November 17, 2024

              Sanctuary & Wilson Chapel Grand Re-Opening

              January 24, 2025

              CFM & Lodge Grand Re-Opening
              Steeple Coffee Opens

               

              All construction projects are moving targets. Please be flexible if dates and construction areas shift. Thank you.